Our Services
Our Services
UBC Holding and Al-Faez Engineering combine international financing with proven local execution to deliver turnkey EPC projects, industrial production lines and long-term O&M — from feasibility and financing through design, construction and handover.
Project Financing & Commercial Structuring (UBC services)
Financing structures, guarantees (BG/LC), settlement solutions and banking relationships.
EPC Infrastructure (Design — Supply — Construct)
Roads, water networks, pumping stations, stormwater drainage, treatment and municipal/industrial infrastructure. CTA: Request Project Evaluation.
Industrial Production Lines
Design, supply and installation of manufacturing lines — food, packaging, LED production and assembly lines. CTA: Get a Preliminary Quote.
Water & Drainage Systems
Stormwater networks, lift stations, inspection chambers, system rehabilitation. CTA: Download System Catalog.
Streetlighting & LED Manufacturing Plants
Turnkey production lines for LED luminaires and poles (assembly, coating, optics). CTA: Request Feasibility Study.
Operation & Maintenance (O&M)
Long-term O&M contracts, spare parts management, proactive support and training. CTA: Learn More.
UBC HOLDING SERVICES
UBC Holding provides integrated Energy, Finance and Oil & Gas solutions — developing and operating renewable and grid assets, structuring project finance and guarantees, and delivering pipeline, terminal and midstream infrastructure with full HSE and lifecycle support.
Al-Faez Engineering Services
Al-Faez Engineering Services
Al-Faez Engineering delivers integrated construction and operational services in Iraq, with expertise in infrastructure, production lines, and operational maintenance — supported by local project management teams and skilled execution crews to ensure quality, on-schedule delivery, and budget control.
Design and construction of stormwater collection systems — surface channels and small culverts — plus supply and installation of integrated pumping and control stations to ensure effective drainage and reduce urban and industrial flooding risk.
Full roadworks from earthworks through final surfacing — including subgrade preparation, base layers, and final asphalt or compacted aggregate surfacing.
Design and construction of sewer networks and building/industrial connections, with the option to separate stormwater from sewage systems where required.
Supply, installation and supervision of integrated production lines (industrial, food, electrical) with engineering oversight for mechanical/electrical installation and system integration.
Preventive and corrective maintenance services and full commissioning activities to ensure facility and plant readiness and operational continuity.
Comprehensive project management including contractor management, risk control, scheduling, cost monitoring, plus logistics solutions for procurement, manpower and equipment inside Iraq.
Our Projects














Sample project cards
Browse our project case studies to see real EPC delivery — scope, schedule and results across water, roads and industrial work
Rehabilitation, Planting and Refurbishment of Stormwater Sewer Networks — Phase II (Technical Institute)
* Duration: 190 days
* Completion date: 2015-02-05 (February 5, 2015)
* Contract value: 2,311,000,000 (local currency)
Stormwater Networks & Pumping Stations — Al-Furqa (Lot 1)
* Duration: 200 days
* Completion date: 2013-10-08 (October 8, 2013)
* Contract value: 3,156,681,000 (local currency)
Road Rehabilitation — Baghdad (Camp to Industrial Area) — Length: 5,200 m
* Duration: 220 days
* Completion date: 2010-01-20 (January 20, 2010)
* Contract value: 6,694,750,000 (local currency)
Construction of Road — Umm Ubaida Village (Sid Ahmed Al-Rifa’i Area)
* Duration: 120 days
* Completion date: 2012-10-17 (October 17, 2012)
* Contract value: 1,402,000,000 (local currency)
* Duration: 220 days
* Completion date: 2010-01-20 (January 20, 2010)
* Contract value: 6,694,750,000 (local currency)
Stormwater Networks & Pumping Stations — Al-Mutayfiyya Center (Lot 1)
* Duration: 200 days
* Completion date: 2012-11-10 (November 10, 2012)
* Contract value: 5,524,554,000 (local currency)
Water Works Maintenance — Hor Al-Zubair Well & Booster Station (Safwan)
* Duration: 140 days
* Completion date: 2012-03-13 (March 13, 2012)
* Contract value: 2,190,471,000 (local currency)
Al-Ibala Sewer Project
* Duration: 90 days
* Completion date: 2008-06-15 (June 15, 2008)
* Contract value: 1,581,000,000 (local currency)
Al-Intisar Neighborhood Sewer Project
* Duration: 90 days
* Completion date: 2008-06-15 (June 15, 2008)
* Contract value: 812,000,000 (local currency)
Construction of Mohammad Joon Road (5 km) and Service Road (5 km)
* Duration: 160 days
* Completion date: 2013-06-15 (June 15, 2013)
* Contract value: 1,080,000,000 (local currency)